Products Description
As an important rare earth functional material, gadolinium plays an irreplaceable role in the fields of magnetic refrigeration, neutron protection and solid-state devices due to its unique 4f electron configuration (4f⁷5d¹6s²) and huge magnetocaloric effect.
The gadolinium sputtering target is a composed of high-purity metal europium (Gd). It has a melting point of 1312°C, a boiling point of 3250°C, and a density of 7.895g/cm3. Gadolinium is a silvery-white metal when oxidation is removed. It is only slightly malleable and is a ductile rare-earth element. Gadolinium reacts with atmospheric oxygen or moisture slowly to form a black coating.
Gadolinium (Gd) Specifications
|
Material Type |
Gadolinium |
|
Symbol |
Gd |
|
Atomic Weight |
157.25 |
|
Atomic Number |
64 |
|
Color/Appearance |
Silvery White, Metallic |
|
Thermal Conductivity |
11 W/m.K |
|
Melting Point (°C) |
1,313 |
|
Coefficient of Thermal Expansion |
9.4 x 10-6/K |
|
Theoretical Density (g/cc) |
7.9 |
|
Ferromagnetic |
Magnetic Material |
|
Z Ratio |
0.67 |
|
Sputter |
DC |
|
Max Power Density |
20* |
|
Comments |
High Ta solubility |
Application
(1) Magnetic refrigeration technology
Room temperature magnetic refrigerator
Micro refrigeration chip
(2) Nuclear radiation protection
Neutron shielding layer
Nuclear fuel cladding
(3) Spintronic devices
Topological insulators
Magnetic tunnel junctions
(4) Medical imaging
MRI contrast agents
Related Sputtering Materials
CeGd sputtering target
GdFeCo sputtering target
Gd2O3 sputtering target
Are you a factory or manufacturer?
A: Yes, we are a factory but we generally use our trading company to handle the business abroad. It will be more convenient to receive the remittance and arrange the shipment.
What is the delivery method?
A: Generally, we send cargo by UPS, DHL or FedEx. Also, we can send by sea to seaport or by air to the closest airport.
Why is your product so cost-effective?
A: We cut out the middlemen in the end-to-end manufacturing process. We obtain our raw material directly from its source.
Do you do spot quality inspection or full inspection?
A: 100% full inspection. Inspectors will check the finished product individually, to ensure they adhere to all parameters. All unqualified products are discarded.
How do you ensure your lead time?
A: From material preparation to machining, and finally to a full inspection. Every stage of production is strictly monitored and controlled to give you an accurate delivery time.
What is the MOQ?
A: Depends on quantity, generally, no MOQ limit.
How to pay for it?
A: A bank transfer (T/T) will be acceptable.
What is the delivery time?
A: around 7-20 days which depends on the quantity and production.
What is kind of the package?
A: Generally, we use a carton case or plywood case with protective material inside to ensure the save of cargo
What is the lead time?
A: from order placed to cargo receiving will take around 10-25 days.
Hot Tags: Gadolinium Sputtering Target, China Gadolinium Sputtering Target suppliers, factory, , ,


